In 2007 we had in the region of 2800 vehicles driving through Chester Rd every day even though we had a bypass.
Two thirds were breaking the 30 mph speed limit.
Next Monday, Tuesday and Wednesday there will be zero vehicles driving through Chester Rd as the road will be shut whilst the traffic calming platform is laid.
So from next Thursday onwards, no more buses, lorries, bikers or cars hammering along Chester Rd.
A safer place for children and residents.
In my opinion a big day for Chester Rd environment.
To those that are not happy I say use the bypass.
I will do a roll call of those who have helped along the way once the black stuff is down.
Subscribe to:
Post Comments (Atom)
Custom Search
Blog Archive
-
▼
2013
(281)
-
▼
April
(21)
- Penyffordd Websites Galore
- Mrs Margaret Knapper - Funeral
- An Unusual Sight.
- A380 Flight Simulator
- The accident waiting to happen
- To Penyffordd Wine Society for wine tasting
- Penyffordd Cafe opens Sunday 28th April at 10am
- A Cinema Complex plus Pizza just down the road
- If you fancy a laugh
- The Boys from the Black Stuff get stuck in
- From 2800 to Zero
- Spring ball in Penyffordd
- Policing the Police
- Danger Chester Rd 3 Way Traffic Lights
- Cllr Cindy Hinds makes headway over Dobshill speed...
- 20 mph Speed Limits within the village
- Dog Bakery Business in Penyffordd
- Redrow Marketing on the White Lion Development
- The Millstone
- Penyffordd Traffic Calming Under Construction ( Ch...
- The Magic Car
-
▼
April
(21)
Well not quite closed. Penymynydd Rd shut. Chester Rd single lane traffic. The boys from the black stuff have the traffic slowing platform down in 4 hours flat. The ramps which have over a 100 bolts each will take a bit longer. As will access ports to turn off gas and water that are in the road.
ReplyDelete